Construction of New Home Units
- Double Windows Operable
- Paint/Stain Quality - more applications
- Trim - Tighter Corners
- Wider Sidewalks - 48" and 42"
- Premium Studs (Finger Jointed for straighter walls)
- Lumber - Pre-Dried & Home Lumber Quality
- 12" I-Beam Joist (Straighter and Stronger - Pre-dried)
- Continuous Attic Ventilation
- Insulated Treated Plates (Black Jack, Sill Sealer, Black Jack Protection)
- Anderson Windows (Argon & LoE)
- SEER 11 A/C Units (5% more efficient than SEER 10)
- Air Quality Experts (Whole House Air Cleaners standard)
- Vinyl in Baths (Not Carpet)
- High Speed Wiring (Cat 5e & RG6)
- Upgraded Trane Furnace (Not Builder's Grade)
- 12" Overhang on Gable Ends
- 1 Piece Shower/Tub Units (not caulked together)
- Doors on all Shower Units
- More Cabinets in the Kitchen
- Insulated Headers (R-value of 18)
- Shingles Nailed, Not Stapled
- Delta Faucets
- Proper Grading on Property
- 5/8" Drywall on Ceilings (Prevents Bowing)
- Correct Primer on Walls to Achieve True Color of Paint
- Driveways are sealed
- Proper Subfloor Under All Hard Surface Materials
- Vinyl floor is completely glued down, not just perimeter
- Fine Grade and Seeded Lawn
- Casing around doors and windows
- Custom Grabill or Schmucher Cabinets
- Stick built rafters, allowing on-site adjustments
- 3 1/4" Standard Base Trim
- Foam Insulation around exterior doors, windows, and electrical openings
- Insulated corners
- Insulated Can Lights where needed
- Beveled Porch Railing
- Vapor Barrier on Tuff R
- Quality Vytec Siding
- Structured Wiring
- ThermaTru Doors
- Concave, or Tooled, mortar joints between exterior bricks to prevent freezing
- Anti-siphon freeze-less water spigots - eliminates pipe rupture during freezing conditions, even if pipe is left on